版权说明 操作指南
首页 > 成果 > 成果详情

Upper Bound Limit Analysis for Seismic Stability of Rock Slope with Tunnel

认领
导出
下载 Link by DOI
反馈
分享
QQ微信 微博
成果类型:
期刊论文
作者:
Jiang, Xueliang;Niu, Jiayong*;Yang, Hui;Wang, Feifei
通讯作者:
Niu, Jiayong
作者机构:
[Niu, Jiayong; Jiang, Xueliang; Wang, Feifei; Yang, Hui] Cent South Univ Forestry & Technol, Coll Civil Engn, Changsha 410004, Hunan, Peoples R China.
[Niu, Jiayong; Jiang, Xueliang; Wang, Feifei; Yang, Hui] Cent South Univ Forestry & Technol, Rock & Soil Engn Res Inst, Changsha 410004, Hunan, Peoples R China.
通讯机构:
[Niu, Jiayong] C
Cent South Univ Forestry & Technol, Coll Civil Engn, Changsha 410004, Hunan, Peoples R China.
Cent South Univ Forestry & Technol, Rock & Soil Engn Res Inst, Changsha 410004, Hunan, Peoples R China.
语种:
英文
期刊:
Advances in Civil Engineering
ISSN:
1687-8086
年:
2018
卷:
2018
页码:
1-11
基金类别:
+e authors are grateful for the financial support from the National Natural Science Foundation (NNSF) of China through Grant nos. 51204215 and 51404309.
机构署名:
本校为第一且通讯机构
院系归属:
土木工程学院
摘要:
The rock slopes with tunnels appear widely in the actual project, but there is no executable basis for the seismic stability calculation of the rock slope with tunnel. According to the upper bound theorem of plastic limit analysis and pseudostatic method, the upper bound solution of the safety factor of the rock slope with tunnel was rigorously derived under earthquake loading. This upper solution takes into account the design parameters of the slope and the tunnel, the horizontal and vertical seismic loads, and the physical and mechanical para...

反馈

验证码:
看不清楚,换一个
确定
取消

成果认领

标题:
用户 作者 通讯作者
请选择
请选择
确定
取消

提示

该栏目需要登录且有访问权限才可以访问

如果您有访问权限,请直接 登录访问

如果您没有访问权限,请联系管理员申请开通

管理员联系邮箱:yun@hnwdkj.com