Blasting excavation and vibration monitoring design for diversion tunnel

认领
导出
下载 Link by DOI
反馈
分享
QQ微信 微博
成果类型:
期刊论文、会议论文
作者:
Hu, Qigao*;Cui, WeiFeng;Gao, Jingwei;Zhao, Feiwei;Liang, Qianfu
通讯作者:
Hu, Qigao
作者机构:
[Hu, Qigao; Cui, WeiFeng; Gao, Jingwei] Natl Univ Def Technol, Coll Basic Educ Commanding Officers, Changsha 410072, Hunan, Peoples R China.
[Zhao, Feiwei] Ganxi Civil Engn Survey & Design Inst, Yichun, Jiangxi, Peoples R China.
[Liang, Qianfu] Coll Civil Engn & Mech, Cent S Univ Forestry & Technol, Changsha, Hunan, Peoples R China.
通讯机构:
[Hu, Qigao] N
Natl Univ Def Technol, Coll Basic Educ Commanding Officers, Changsha 410072, Hunan, Peoples R China.
语种:
英文
关键词:
Blasting excavation;Diversion tunnel;Reservoir;Vibration monitoring
期刊:
Advanced Materials Research
ISSN:
1022-6680
年:
2013
卷:
639-640
期:
1
页码:
969-973
会议名称:
1st International Conference on Advances in Civil Infrastructure Engineering (ICACIE 2012)
会议论文集名称:
Advanced Materials Research
会议时间:
SEP 15-16, 2012
会议地点:
Changsha, PEOPLES R CHINA
会议主办单位:
[Hu, Qigao;Cui, WeiFeng;Gao, Jingwei] Natl Univ Def Technol, Coll Basic Educ Commanding Officers, Changsha 410072, Hunan, Peoples R China.^[Zhao, Feiwei] Ganxi Civil Engn Survey & Design Inst, Yichun, Jiangxi, Peoples R China.^[Liang, Qianfu] Coll Civil Engn & Mech, Cent S Univ Forestry & Technol, Changsha, Hunan, Peoples R China.
会议赞助商:
Cent S Univ Forestry & Technol, Hunan Univ, Univ So California, Univ California Davis, Sapienza Univ Rome, Natl Nat Sci Fdn, Cent S Univ, Xiangtan Univ, Changsha Univ Sci & Technol, Hunan Univ Sci & Technol, Hunan Univ Technol, Univ S China, Survey & Design Inst, Hunan Prov Commun Plann, Foshan Highway & Bridge Construct Co Ltd
主编:
Zhou, XY He, GJ Fan, YL Xiao, Y Kunnath, SK Monti, G
出版地:
KREUZSTRASSE 10, 8635 DURNTEN-ZURICH, SWITZERLAND
出版者:
TRANS TECH PUBLICATIONS LTD
ISBN:
978-3-03785-584-3
机构署名:
本校为其他机构
院系归属:
土木工程学院
摘要:
Because of the local crack and seepage, a double curvature arch dam of concrete block in Jiangxi Province was urgently needed to strengthen, and the construction period was limited seriously. In order to solve the problem of drainage, a diversion tunnel about 24m must get throng in two weeks, and it is proved that the blasting excavation scheme is the only choice. Meanwhile, monitoring measurement must be taken to ensure the dam's safety. In this article, the optimization design of blasting excavation and a vibration monitoring are completed an...